Our Facilities
With our own facility we make sure give you the best price and competitive Processing equipment and processing units are fabricated or constructed supported by our two fabrication facilities with a total of 15,000 m2 Building only and 35,000 m2 Land will plan for storage . The Company is committed to being the reliable project partner and a one-stop solution partner for new processing plants, as well as capacity upgrade.
1.Cibinong Factory
1100 m2 With full facility
2. Karawang Factory Complex
15,000 m2 With full facility
> Building A
6500 m2 With full facility with Height of building 7 Meters lift Over Head Crane lift up
> Building- B
Epoxy Floor for Hygienic Product 3000 m2 With full facility with Height of building 7 Meters lift Over Head Crane lift up
> Building-C
5500 m2 With full facility with Height of building for 7 Meters lift Over Head Crane lift up
> Building-D
5500m2 With full facility with Height of building for 10 Meters lift Over Head Crane lift up
3.Tools Supporting
- Plasma cutting
- Roll Plate Machine Width 2 Meter
- Bending Plate Width 2 Meter
- Cutting plate guilty up to 15 mm Width 2m
- Over Head Crane with Load 5~7 Ton Every Building
- Test Pressure Facility
- Drill Machine
- CNC Lathe Machine
- Precision Lathe Machine 1000x 6000mm
- Precision Lathe Machine 450x 1000mm
- MIG, TIG, SMAW – Welding Machine
- Orbital Welding Machine
- Shaping Machine
- Roll Machine
- Land for Temporary Storage